Work Method Improvement Using MOST to Increase Housing Process Output

A Study Case at PT. BEI Plant 3

Authors

Keywords:

Work Measurement, Productivity, MOST, Assembly Line, SWTM

Abstract

PT. BEI Plant 3 is a vehicle electrical component manufacturer that serves the automotive industry. The company is currently unable to meet customers' demands with their regular capacity. We conduct preliminary research and brainstorming sessions with management to identify potential causes of the problem. A problem with the housing process causes an imbalance of work throughout the assembly line, where we find numerous idle workstations. Therefore, we propose work method improvement using Maynard Operation Sequence Technique (MOST) to improve production output. Furthermore, we also use Stopwatch Time Measurement (SWTM) to retrieve actual standard time and describe the current housing process state. The result shows that MOST may increase estimated revenue by 30%. On the other hand, the result also indicates that the work method is not the actual cause of the company's problem, as the actual standard time may fulfil the demand. We advise further study to explore other potential causes of the current issue.

References

S. Konz dan S. Johnson, Work Design. CRC Press, 2018. doi: https://doi.org/10.1201/9780203733714.

N. V. Febriana, E. R. Lestari, dan S. Anggarini, “Analisis pengukuran waktu kerja dengan metode pengukuran kerja secara tidak langsung pada bagian pengemasan di PT Japfa Comfeed Indonesia Tbk,” Industria: Jurnal Teknologi dan Manajemen Agroindustri, vol. 4, no. 1, hlm. 66–73, 2015.

D. P. Andriani, “PENENTUAN WAKTU DAN OUTPUT BAKU PADA PROSES PRODUKSI TUBE LAMP DENGAN METHODS TIME MEASUREMENT,” SINERGI, vol. 21, no. 3, hlm. 204, Nov 2017, doi: https://doi.org/10.22441/sinergi.2017.3.007.

L. Gozali, L. Widodo, dan T. Gunawan, “PERBAIKAN LINI FINISHING DRIVE CHAIN AHM OEM PADA PT FEDERAL SUPERIOR CHAIN MANUFACTURING DENGAN METODE KESEIMBANGAN LINI DAN METHODS TIME MEASUREMENT,” Jurnal Teknik dan Ilmu Komputer, vol. 1, no. 2, hlm. 174–181, 2012.

H. L. Afrian, R. Alfatiyah, dan K. Subarman, “PERBAIKAN SISTEM PRODUKSI DENGAN METODE TIME STUDY DAN LINE BALANCING UNTUK EFISIENSI PROSES PENGEMASAN PADA CV. TIRTA SASMITA,” TEKNOLOGI, vol. 3, no. 1, hlm. 73–81, Mar 2020, doi: http://dx.doi.org/10.32493/tkg.v3i1.19259.

M. Jamil, M. Gupta, A. Saxena, dan M. V. Agnihotri, "Optimization of Productivity by Work Force Management through Ergonomics and Standardization of Process Activities using MOST Analysis-A Case Study," Global Journal of Research In Engineering, 2013, Diakses: Sep 26, 2022. [Daring]. https://engineeringresearch.org/index.php/GJRE/article/view/852

A. N. M. Karim, S. T. Tuan, dan H. M. Emrul Kays, "Assembly line productivity improvement as re-engineered by MOST," International Journal of Productivity and Performance Management, vol. 65, no. 7, hlm. 977–994, Sep 2016, doi: https://doi.org/10.1108/IJPPM-11-2015-0169.

M. A. Mishra, M. V. Agnihotri, dan D. v Mahindru, "Application of maynard operation sequence technique (MOST) at Tata motors and Adithya automotive application Pvt Ltd. Lucknow for enhancement of productivity-A case study," Global Journal of Research In Engineering, Mei 2014, Diakses: Sep 26, 2022. [Daring]. Available: https://engineeringresearch.org/index.php/GJRE/article/view/1058

T. K. Yadav, "Measurement time method for engine assembly line with help of Maynard Operating Sequencing Technique (MOST)," International Journal Of Innovations In Engineering And Technology (IJIET), vol. 2, no. 2, Apr 2013.

F. Assef, C. T. Scarpin, dan M. T. Steiner, "Confrontation between techniques of time measurement," Journal of Manufacturing Technology Management, vol. 29, no. 5, hlm. 789–810, Mei 2018, doi: https://doi.org/10.1108/JMTM-12-2017-0253.

R. Kumar, A. Charak, dan G. Thakur, "Productivity Improvement of an Automotive Assembly Line using Modular Arrangement of Predetermined Time Standards (MODAPTS)," i-Manager's Journal on Future Engineering and Technology, vol. 16, no. 2, hlm. 32, 2020.

E. A. H. Hanash, A. N. M. Karim, S. T. Tuan, dan A. K. M. Mohiuddin, "Throughput Enhancement of Car Exhaust Fabrication Line by Applying MOST," IOP Conf Ser Mater Sci Eng, vol. 184, hlm. 12022, Mar 2017, doi: https://doi.org/10.1088/1757-899x/184/1/012022.

H. Cho, S. Lee, dan J. Park, "Time estimation method for manual assembly using MODAPTS technique in the product design stage," Int J Prod Res, vol. 52, no. 12, hlm. 3595–3613, Jun 2014, doi: https://doi.org/10.1080/00207543.2013.878480.

Z. J. Viharos dan B. Bán, "Comprehensive Comparison of MTM and BasicMOST, as the Most Widely Applied PMTS Analysis Methods," 2020.

V. Polotski dan Y. Beauregard, “Work-Time Identification and Effort Assessment: Application to Fenestration Industry and Case Study,” IFAC-PapersOnLine, vol. 51, no. 15, hlm. 569–574, 2018, doi: https://doi.org/10.1016/j.ifacol.2018.09.217.

Published