Meningkatkan Output dan Penerapan Metode MOST Pada Housing line 5 assy 3210-K2V-N410 Teaching Factory STT Texmaco Subang

Authors

  • R.M. Sugengriadi Sekolah Tinggi Teknologi Texmaco
  • Santo Wibowo Sekolah Tinggi Teknologi Texmaco
  • Siti Masfufah Sekolah Tinggi Teknologi Texmaco

Keywords:

MOST, wirring harness, kaizen, metode kerja.

Abstract

At the company PT. Piranti Teknik Indonesia is a private manufacturing company in Indonesia which is part of the Banshu group company which operates under PT. Banshu Electric Indonesia especially in the production of wiring harnesses for vehicles with a strong working method with improvements carried out continuously and maintained by improving working methods using the MOST (Maynard Operation Sequence Time) method. MOST (Maynard Operation Sequence Time). is a method of measuring standard time and standard work output. Data taken from a movement element is given parameters according to the movements that correspond. 4 main factors (operator, material, machine, method) and work method improvement using the MOST (Maynard Operation Sequence Time) method.The aim of this research is to find out whether there is a difference in the standard time results indirectly from the observation section with the previous method. And the Maynard Operation Sequence Time measurement results using the previous method are the standard time of 73.96 seconds/operator and the production output is 500 per day and the method has been improved with the most method, namely to 22.72/operator and the production output is 1,440 units per day. So the most method is better than the old method, This measurement is due to the division of work movements of one unit in the TMU of each method.

References

Albertus laurensius setyabudhi (2021) Perancangan Tata Letak Fasilitas. (ID) : Cendikia Mulia Mandiri.

Andre F. G. Munthe.(2019) Perbaikan Metode Kerja Untuk Meningkatkan Output Produksi Menggunakan Metode Most. PT Suryamas Lestariprima (ID) : USU Repository

Annisa, R. (2020). Penentuan Waktu Standart Dengan Pendekatan Maynard Operation Sequence Technique (MOST). Matrik: Jurnal Manajemen dan Teknik Industri Produksi, 20(2), 7-12

Budi Harsanto. (2022) Dasar – Dasar Manajement Operasi. Jakarta (ID) : Prenada Media.

Gatot Nazir ahmad. (2020) Manajemen Operasi. Jakarta (ID) : Bumi aksara

H. Agus Maulana., & Muhammad Naufal Anshory. (2023). Pengantar Ilmu Manajemen. Banyumas, Jawa Tengah (ID) : wawasan Ilmu.

Hanafie, A., Haslindah, A., Musrawati, M., Madinah, M., & Masna, S. (2018). Analisa Studi Gerak Dan Waktu Kerja Pada Produksi Abon Ikan Di Ikm Zauky Di Kabupaten Pinrang. ILTEK, 13(02), 1933-1937.

Hidayatullah, R. I. N., Pratama, Y., & Adelino, M. I. (2023). Analisis Pengukuran Waktu Kerja Mengunakan Metode Maynard Operation Sequence Tecnique (MOST) Pada UMKM Kebab Dara Syawarma. Jurnal Sains dan Teknologi (JSIT), 3(1), 134-140.

Julianus Hutabarat. (2022). Pengantar Teknik Industri. Malang (ID) : Media Nusa Creative (MNC Publishing).

Jumadi. (2021) Manajemen Operasi. Purwodadi-Grobongan, Jawa Tengah. (ID) Penerbit CV: SARNU UNTUNG

Published

2024-04-01