Pemanfaatan Aliran Irigasi Di Desa Kutapohaci Kabupaten Karawang Untuk Merancang Pembangkit Listrik Tenaga Piko Hidro
Keywords:
Pembangkit Listrik, Piko Hidro, Generator DC, Kincir AirAbstract
Pico hydropower plants are a type of alternative energy that uses water as a resource. This small-scale power plant can be applied in rural areas where the river flow has a constant water flow and the water fall rate is low enough to drive turbines that can produce electrical power. For example, irrigation flows in Kutapohaci Village, Karawang Regency, can be used as an energy source. This design begins with reviewing the location, measuring water discharge, selecting generators and turbines, and building and testing PLTPH. In this research, the irrigation canal water discharge measured at 0.18 m3/second will be converted into kinetic energy using a 50 cm diameter windmill with 16 blades, and then the kinetic energy is converted into electrical energy via a DC generator. Turbine and generator testing was carried out directly in the irrigation stream with an average rotation of 56 rpm. Meanwhile, in testing the DC generator to charge batteries, at 160 rpm, it produces a current of 0.08 A and a voltage of 4.6 V. This PLTPH turbine can produce 1.65 watts of power with a turbine efficiency of 3.55%. The energy produced by the PLTPh system is 0.162 Wh.
References
Y. I. Nakhoda, I. B. Sulistiawati, A. Soetedjo, and J. T. Elektro, “Penerapan Pembangkit Listrik Tenaga Pikohidro,” Apl. Dan Inov. Ipteks SOLIDITAS, vol. 5068, pp. 99–109, 2018.
M. L. Hakim, N. Yuniarti, Sukir, and E. S. Damarwan, “Pengaruh Debit Air Terhadap Tegangan Output Pada,” J. Edukasi Elektro, vol. 4, no. 1, pp. 75–81, 2020.
E. Elfiano and A. Dinata, “Pembuatan Kincir Air Untuk Pembangkit Listrik Dengan Pemanfaatan Arus Air Sungai,” J. Pengabdi. Umr., vol. 1, no. 2, 2017.
W. Hidayat, “Prinsip Kerja dan Komponen - Komponen Pembangkit Listrik Tenaga Air (PLTA) Wahyu Hidayat,” 2019.
U. Amri, P. Studi Teknologi Rekayasa Pembangkit Energi Jurusan Teknik Elektro, and P. Negeri Lhokseumawe, “Rancang Bangun Pembangkit Listrik Tenaga Piko Hidro (Pltph) (Analisis Daya Beban Ouput Pada Generator),” J. Tektro, vol. 5, no. 1, p. 100, 2021, [Online]. Available: http://e-jurnal.pnl.ac.id/TEKTRO/article/view/2803
S. Sunardi, “Mikrohidro Untuk Solusi Daerah Terpencil,” Conf. Senat. STT Adisutjipto Yogyakarta, vol. 3, 2017, doi: 10.28989/senatik.v3i0.124.
S. Sofiah and M. D. Irawan, “Rancang Bangun Pengisian Akumulator Pada Pembangkit Listrik Alternatif Untuk Kebutuhan Listrik Rumah Tangga,” J. Surya Energy, vol. 3, no. 2, p. 307, 2019, doi: 10.32502/jse.v3i2.1533.
N. Alipan, “Pengembangan Pembangkit Listrik Tenaga Pico-Hydro Dengan Memanfaatkan Alternator Untuk Membantu Penerangan Jalan Seputaran Kebun Salak,” J. Edukasi Elektro, vol. 2, no. 2, pp. 59–70, 2018, doi: 10.21831/jee.v2i2.22457.
A. W. Hasanah, “Perancangan Sistem Pembangkit Listrik Tenaga Surya Off Grid 6,4 KWp Untuk 1 Unit Rumah Tinggal,” Energi & Kelistrikan, vol. 13, no. 1, pp. 20–25, 2021, doi: 10.33322/energi.v13i1.965.
I. D. N. D. Putra and W. Winarso, “Perancangan Pembangkit Listrik Tenaga Pikohidro Menggunakan Generator DC Shunt,” J. Ris. Rekayasa Elektro, vol. 4, no. 1, 2022, doi: 10.30595/jrre.v4i1.11634.
D. Desmira, “Aplikasi Sensor Ldr (Light Dependent Resistor) Untuk Efisiensi Energi Pada Lampu Penerangan Jalan Umum,” PROSISKO J. Pengemb. Ris. dan Obs. Sist. Komput., vol. 9, no. 1, pp. 21–29, 2022, doi: 10.30656/prosisko.v9i1.4465.
D. Cahaya, Nurul Yanti., “Hukum Ohm dan Hukum Kirchoff,” J. Prakt. Elektron. Dasar, vol. 357182684, no. 1, pp. 1 – 6, 2019.
M. Irwan and E. Jalil, “Pemodelan Matematika Dalam Sistem Massa Pegas,” J. MSA ( Mat. dan Stat. serta Apl. ), vol. 7, no. 1, p. 33, 2019, doi: 10.24252/msa.v7i1.7520.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Lilik Hari Santoso, Budi Sunarto, Rizkika Fitri, Evika Nurmala
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.