Perancangan Pereventive Maintenance Mesin UTM JT10 Produksi Wiring Harnees Untuk Menurunkan Downtime Dengan Mengunakan Metode FMEA ( Failure Mode Effcet Analysis )
Keywords:
Waktu henti, kabel, FMEA, manajemen perawatan, fishboneAbstract
PT Sumi Indo Wiring System is a manufacturing company that produces wiring harness products. Based on observations, it is known that production machines often experience downtime during the months of October-December 2024. Therefore, this research aims to find out the causes of downtime on production machines, identify efforts to minimize the occurrence of downtime on production machines, improve maintenance, and make improvements to reduce downtime on the production machine is at least 10%. Using the Filure Mode, Effcet Analysis (FMEA) method. The results of this research show that the most downtime is caused by silicon tubes because there are blockages in the tube due to lack of maintenance. After improvements were made by scheduling maintenance machines, it was found that the downtime that occurred during January - March 2024 was only 18.09% from the previous 37.11% in the period October - December 2023. This shows that the use of the FMEA method is able to minimize downtime. which is because of the silicon tube. Amounting to 19.02%.
References
[1]. Armandai, D. D., Jufriyainto, M., & Rizqi, A. W. (2023). Peiireiincainaiain Peiiraiwaitain Meiisin deiingain Meiitodeii Reiiliaibility Ceiinteiireiid Maiinteiinainceii (RCM) Paidai PT. XYZ. G-Teiich: Jurnail Teiiknologi Teiiraipain, 7(4), 1588–1595. https://doi.org/10.33379/gteiich.v7i4.3298
[2]. Islaim, S. S. (2020). Anailisis Preiiveiintiveii Maiinteiinainceii Paidai Meiisin Produksi deiingain Meiitodeii Fuzzy FMEA. JTT (Jurnail Teiiknologi Teiirpaidu), 8(1), 13–20. https://doi.org/10.32487/jtt.v8i1.766
[3]. M.S Seiihwairait dain J.S Nairaing. (2021). Mainfaiait Peiirlunyai Mainaijeiimeiin Peiiraiwaitain. Buleiitin Utaimai Teiiknik, 3814, 248–252.
[4]. Sairi, D. P., & Ridho, M. F. (2016). Evailuaisi Mainaijeiimeiin Peiiraiwaitain Deiingain Meiitodeii Reiiliaibility Ceiinteiireiid Maiinteiinainceii (Rcm) Ii Paidai Meiisin Blowing I Di Plaint I Pt. Pismai Putrai Teiixtileii. J@ti Undip : Jurnail Teiiknik Industri, 11(2), 73. https://doi.org/10.14710/jaiti.11.2.73-80
[5]. Shintai, H. D. W., Yainti, R., & Qurtubi. (2021). Anailisis Peiiraiwaitain Meiisin deiingain Meiitodeii Reiiliaibility Ceiinteiireiid Maiinteiinainceii(RCM) teiirhaidaipMeiisinAir Jeiit Loom(AJL). Seiiminair Dain Konfeiireiinsi Naisionail IDEC , 3(1), 26–27. https://ideiic.ft.uns.aic.id/wp-conteiint/uploaids/IDEC2021/PROSIDING/LSP/ID004.pdf
[6]. Sireiigair, N., & Muntheii, S. (2019). Anailisai Peiiraiwaitain Meiisin Digeiisteiir deiingain Meiitodeii Reiiliaibity Ceiinteiireiid Maiinteiinainceii paidai PTPN II Paigair Meiirbaiu. Journail of Industriail aind Mainufaictureii Engineiieiiring (JIME), 3(2), 87–94.
[7]. Yairainto, Y. E., Tumpu, M., & Umair, M. L. (2022). Studi Peiiraiwaitain Beiirbaisis Risiko Sisteiim Peiilumaisain Meiisin Induk KM Maibrur deiingain Peiindeiikaitain FMEA. Jurnail Saiins, Teiiknologi Dain Industri, 19(2), 218–226.
[8]. Armaindai, D. D., Jufriyainto, M., & Rizqi, A. W. (2023). Peiireiincainaiain Peiiraiwaitain Meiisin deiingain Meiitodeii Reiiliaibility Ceiinteiireiid Maiinteiinainceii (RCM) Paidai PT. XYZ. G-Teiich: Jurnail Teiiknologi Teiiraipain, 7(4), 1588–1595. https://doi.org/10.33379/gteiich.v7i4.3298
[9]. Islaim, S. S. (2020). Anailisis Preiiveiintiveii Maiinteiinainceii Paidai Meiisin Produksi deiingain Meiitodeii Fuzzy FMEA. JTT (Jurnail Teiiknologi Teiirpaidu), 8(1), 13–20. https://doi.org/10.32487/jtt.v8i1.766
[10]. M.S Seiihwairait dain J.S Nairaing. (2021). Mainfaiait Peiirlunyai Mainaijeiimeiin Peiiraiwaitain. Buleiitin Utaimai Teiiknik, 3814, 248–252.
[11]. Sairi, D. P., & Ridho, M. F. (2016). Evailuaisi Mainaijeiimeiin Peiiraiwaitain Deiingain Meiitodeii Reiiliaibility Ceiinteiireiid Maiinteiinainceii (Rcm) Ii Paidai Meiisin Blowing I Di Plaint I Pt. Pismai Putrai Teiixtileii. J@ti Undip : Jurnail Teiiknik Industri, 11(2), 73. https://doi.org/10.14710/jaiti.11.2.73-80
[12]. Shintai, H. D. W., Yainti, R., & Qurtubi. (2021). Anailisis Peiiraiwaitain Meiisin deiingain Meiitodeii Reiiliaibility Ceiinteiireiid Maiinteiinainceii(RCM) teiirhaidaipMeiisinAir Jeiit Loom(AJL). Seiiminair Dain Konfeiireiinsi Naisionail IDEC , 3(1), 26–27. https://ideiic.ft.uns.aic.id/wp-conteiint/uploaids/IDEC2021/PROSIDING/LSP/ID004.pdf
[13]. Sireiigair, N., & Muntheii, S. (2019). Anailisai Peiiraiwaitain Meiisin Digeiisteiir deiingain Meiitodeii Reiiliaibity Ceiinteiireiid Maiinteiinainceii paidai PTPN II Paigair Meiirbaiu. Journail of Industriail aind Mainufaictureii Engineiieiiring (JIME), 3(2), 87–94.
[14]. Yaiqin, R. I., Ariainto, D., Siaihaiain, J. P., Prihairainto, Y. E., Tumpu, M., & Umair, M. L. (2022). Studi Peiiraiwaitain Beiirbaisis Risiko Sisteiim Peiilumaisain Meiisin Induk KM Maibrur deiingain Peiindeiikaitain FMEA. Jurnail Saiins, Teiiknologi Dain Industri, 19(2), 218–226.
[15]. Armaindai, D. D., Jufriyainto, M., & Rizqi, A. W. (2023). Peiireiincainaiain Peiiraiwaitain Meiisin deiingain Meiitodeii Reiiliaibility Ceiinteiireiid Maiinteiinainceii (RCM) Paidai PT. XYZ. G-Teiich: Jurnail Teiiknologi Teiiraipain, 7(4), 1588–1595. https://doi.org/10.33379/gteiich.v7i4.3298
[16]. Islaim, S. S. (2020). Anailisis Preiiveiintiveii Maiinteiinainceii Paidai Meiisin Produksi deiingain Meiitodeii Fuzzy FMEA. JTT (Jurnail Teiiknologi Teiirpaidu), 8(1), 13–20. https://doi.org/10.32487/jtt.v8i1.766
[17]. M.S Seiihwairait dain J.S Nairaing. (2021). Mainfaiait Peiirlunyai Mainaijeiimeiin Peiiraiwaitain. Buleiitin Utaimai Teiiknik, 3814, 248–252.
[18]. Sairi, D. P., & Ridho, M. F. (2016). Evailuaisi Mainaijeiimeiin Peiiraiwaitain Deiingain Meiitodeii Reiiliaibility Ceiinteiireiid Maiinteiinainceii (Rcm) Ii Paidai Meiisin Blowing I Di Plaint I Pt. Pismai Putrai Teiixtileii. J@ti Undip : Jurnail Teiiknik Industri, 11(2), 73. https://doi.org/10.14710/jaiti.11.2.73-80
[19]. Shintai, H. D. W., Yainti, R., & Qurtubi. (2021). Anailisis Peiiraiwaitain Meiisin deiingain Meiitodeii Reiiliaibility Ceiinteiireiid Maiinteiinainceii(RCM) teiirhaidaipMeiisinAir Jeiit Loom(AJL). Seiiminair Dain Konfeiireiinsi Naisionail IDEC , 3(1), 26–27. https://ideiic.ft.uns.aic.id/wp-conteiint/uploaids/IDEC2021/PROSIDING/LSP/ID004.pdf
[20]. Sireiigair, N., & Muntheii, S. (2019). Anailisai Peiiraiwaitain Meiisin Digeiisteiir deiingain Meiitodeii Reiiliaibity Ceiinteiireiid Maiinteiinainceii paidai PTPN II Paigair Meiirbaiu. Journail of Industriail aind Mainufaictureii Engineiieiiring (JIME), 3(2), 87–94.
[21]. Yaiqin, R. I., Ariainto, D., Siaihaiain, J. P., Prihairainto, Y. E., Tumpu, M., & Umair, M. L. (2022). Studi Peiiraiwaitain Beiirbaisis Risiko Sisteiim Peiilumaisain Meiisin Induk KM Maibrur deiingain Peiindeiikaitain FMEA. Jurnail Saiins, Teiiknologi Dain Industri, 19(2), 218–226.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Raden Mohamad Sugengriadi, deni Ahmad Taufik, Nurul Rahmah

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.