Perbaikan Waktu Baku dengan Menggunakan Metode Jam Henti dalam Perakitan Wiring Harnes Assy 3210a-Kia-N101-In Proses Housing

Authors

  • R.M Sugengriadi Sekolah Tinggi Teknologi Texmaco
  • Santo Wibowo Sekolah Tinggi Teknologi Texmaco
  • Heri Abdul Azis Sekolah Tinggi Teknologi Texmaco

Keywords:

Standard time, Downtime, Work time measurement.

Abstract

Standard time is the time required by humans to complete a job completely. To measure the standard time or standard, namely stopwatch, time study, work sampling, standard data and predetermined motion time system. based on the results of the calculation of standard time jobdesk operator 5 has the longest time with an average of 98.5, and jobdesk operator 7 becomes part of the fastest process with an average of 72.6. Proposed improvements in order to achieve faster time results for operator 5 by moving the process of installing insert conecctor 3 to operator 7, the standard time after improvement is 1213.9 seconds. Calculated using the adjustment factor is 0.11 and the allowance factor is 142.43%.

References

[1] G. U. Widagdo, “ANALISIS PERHITUNGAN WAKTU BAKU DENGAN MENGGUNAKAN METODE JAM HENTI PADA PRODUK PULLEY DI CV. PUTRA MANDIRI JAKARTA,” vol. XII, no. 1, pp. 119–136, 2019.

[2] N. Yudisha, “Perhitungan waktu baku menggunakan metode Jam Henti pada proses Bottling,” J. Vor., vol. 2, no. 2, pp. 85–90, 2021, doi: 10.54123/vorteks.v2i2.73.

[3] R. Gunawan and W. Wahyudin, “Usulan Penentuan Waktu Baku Metode Jam Henti Pada Proses Pengemasan Produk Kangkung Akar 250gr,” J. Tek. Ind. J. Has. Penelit. dan Karya Ilm. dalam Bid. Tek. Ind., vol. 8, no. 2, p. 223, 2022, doi: 10.24014/jti.v8i2.19631.

[4] Y. D. R. Montororing, “Usulan Penentuan Waktu Baku Proses Racking Produk Amplimesh dengan Metode Jam Henti Pada Departemen Power Coating,” J. Tek., vol. 7, no. 2, pp. 53–63, 2018.

[5] S. Astuti, V. Lusia, and A. Khairunnisa, “Perhitungan Waktu Standart Untuk Menentukan Jumlah Tenaga Kerja dan Kebutuhan Mesin/Alat pada Proses Produksi Reagen Alat/Asat (GPT) FS (IFCC mod) di PT PDL,” J. Kalibr., vol. 3, no. 2, pp. 1–19, 2020.

[6] H. Novantoro and M. Singgih, “Analisis Beban Kerja Dan Penentuan Jumlah Karyawan Divisi Produksi Dalam Menyelesaikan Target Dari Perusahaan,” J. Taguchi J. Ilm. …, pp. 632–644, 2023, [Online]. Available: https://taguchi.lppmbinabangsa.id/index.php/home/article/view/116%0Ahttps://taguchi.lppmbinabangsa.id/index.php/home/article/download/116/117

[7] Widagdo, “Analisis Perhitungan Waktu Baku Dengan Menggunakan Metode Jam Henti Pada Produk Pul,” J. PASTI, vol. XII, no. 1, pp. 6–6, 2013, [Online]. Available: https://publikasi.mercubuana.ac.id/files/journals/3/articles/2797/submission/copyedit/2797-5675-1-CE.pdf

[8] S. Andiyanto, A. Sutrisno, and C. Punuhsingon, “Penerapan Metode FMEA (Failure Mode And Effect Analysis) Untuk Kuantifikasi Dan Pencegahan Resiko Akibat Terjadinya Lean Waste,” J. Online Poros Tek. Mesin, vol. 6, no. 1, pp. 45–57, 2017, [Online]. Available: https://ejournal.unsrat.ac.id/index.php/poros/article/download/14864/14430.

[9] W. D. Permana, I. Bayhaqi, and C. Handayani, “Perancangan Operation Process Chart Dan Pengukuran Waktu Baku Dengan Metode Stopwatch Time,” J. Tek. Mesin dan Ind., vol. 1, no. 1, pp. 5–13, 2022, doi: 10.55331/jutmi.v1i1.5.

[10] I. Sukania and T. Gunawan, “Analisa Waktu Baku Elemen Kerja pada Pekerjaan Penempelan Cutting Stiker di CV Cahaya Thesani,” J. Energi Dan Manufaktur, vol. 7, no. 2, pp. 155–162, 2014.

[11] M. Rahayu and S. Juhara, “Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja,” Unistek, vol. 7, no. 2, pp. 93–97, 2020, doi: 10.33592/unistek.v7i2.650.

[12] M. Rahma and A. J. Pratama, “Pengukuran Waktu Baku Stasiun Kerja Perakitan Komponen Pesawat Garuda Indonesia Temperature Control Valve (Tcv) Menggunakan Metode Jam Henti Pada Pt. Gmf Aeroasia,” Semin. Nas. IENACO, pp. 16–23, 2019.

[13] T. Rachman, J. A. Utara, T. Tomang-Kebon, and J. Jakarta, “Penggunaan Metode Work Sampling Untuk Menghitung Waktu Baku Dan Kapasitas Produksi Karungan Soap Chip Di Pt. Sa,” SA J. InovisiTM, vol. 9, no. 1, p. 48, 2013.

[14] Sritomo Wignjosoebroto (2006). Pengantar Teknik dan Managemen Industri

[15] Sutalaksana, Iftikar Z. Ruhana Anggawisastra, jann H. T. (2006). Teknik Perancangan Sistem Kerja.

Published

2024-10-09